IdrusY., ArifinW., MaruddinM., UlfahM. and MardianaY. (2020) “Tinjauan Waktu dan Biaya Pelaksanaan Pekerjaan Bor Pile Metode Critical Chain Project Management (Kasus: Jembatan Phinisi Center Point of Indonesia)”, Jurnal Teknik Sipil MACCA, 5(3), pp. 259-266. doi: 10.33096/jtsm.v5i3.203.